How to create a Scheduled Export

Configuring a Scheduled Export is very similar to configuring a report (see the Reports section of the EMu Help for detailed information on configuring reports in EMu). In fact the Properties dialog box used to select the fields for export is the same as used by the reporting process. In this section we step through the creation of a new Scheduled Export.